Engineering Manager ANZSCO 133211

CDR Sample for Engineering Manager

CDR Sample for Engineering Manager

CDR Sample: Engineering Manager ANZSCO Code: 133211

The CDR Sample for Engineering Manager includes all the necessary reports, such as Three Career Episodes, Continuing Professional Development Writing, and a Curriculum Vitae Summary Statement. The Content of the CDR Report Sample is as follows:

  • Curriculum Vitae: Resume based on a professional template.
  • Continuing Professional Development Sample: The CPD sample clearly explains the author’s  Engineering Knowledge- 300 words.
  • Engineering Manager Career Episode Sample 1: “Planning and Project Control at Damavand Combined Cycle Power Plant”- (1700 words.
  • Engineering Manager Career Episode Sample 2: “Tehran Cement Power Plant Project “- 1770 words.
  • Engineering Manager Career Episode Sample 3: “PARAND Power Plant Development”- 1520 words.
  • Engineering Manager Summary Statement Sample: Detail explanation of all the competency elements- 1040 words.

The CDR Sample for Engineering Manager incorporates all the required reports, such as a Resume or Curriculum vitae (CV), Continuing Professional Development(CPD), 3 Career Episodes(CE), and a Summary Statement. The CDR Report Samples contain the following contents:

An excellent resume or CV for Engineers Australia Assessment depends on a professional template.

The CPD for Engineers Australia Migration Skills Assessment illuminates the engineering knowledge of the applicant. It should be around 250 words. The documents show how the applicant has developed their career to the point that they need to be assessed by Engineers Australia for Skill Assessment in the desirable engineering occupation.

Engineers must submit 3 career episodes reflecting their work during their study or work.

Engineering Manager Career Episode: Sample 1

Project Name: “Planning and Project Control at Damavand Combined Cycle Power Plant”

In the first career episode, the author describes his project when working for the IFC (Issued for Construction) package stage of the company “Damavand Combined Cycle Power Plant” as a Planning and Project Control Engineer. The project’s name was “Planning and Project Control at Damavand Combined Cycle Power Plant”. The responsibilities of the author were:

To schedule meetings with departments involved
To evaluate the project plan and cost for the project
To report back the progress of the project
To manage the workflow and the documentation of the project in order to meet the requirements and the effective use of resources for the project
To prepare a project action plan to discuss the work to be done
To upload the complete and updated project progress documentation on the company’s online portal

Engineering Manager Career Episode Report: Sample 2

Project Name: Tehran Cement Power Plant Project

In the second Career Episode, the author explains the engineering skills he used in the project he was involved in for the year as an industrial engineer. His duties and responsibilities in the project “Tehran Cement Power Plant Project” were:

To review the documentation of the project, process flow diagram and flowcharts
To analyze the operation of the organization closely
To remove any kind of bottleneck in the operational procedures
To review the existing environmental standards for the operation
To design the allocation time and budget for the project
To constantly monitor the progress of the project and to suggest any kind of suggestion for the same
To develop a custom workflow for the project for the use of the equipment’s and resources for the proper optimization of the cost and procedures

Engineering Manager Career Episode Report: Sample 3

Project Name: PARAND Power Plant Development

In the third Career Episode, the author demonstrates the technical skills he used to complete the project he was involved in for 36 months. The project was “PARAND Power Plant Development”. The key responsibility of the writer was:

To prepare a proposal for the schedule of the work as well as cost
To make use of standard mode of coding, work break down structure and analysis for the development of the project progress report
To work on the planning scheduling and reporting of the status of the work that is being done from the initiation to the completion of each task
To produce a plan for the mitigation of any kind of risk that might occur during the progress of the project
To find out proper strategies and solution for the overcoming of roadblocks and delay